DuneSpan / Intellium Switchgear

Intellium Switchgear

From single-line diagram to a reviewed BOM, estimate and proposal

Agentic engineering AI for LV switchgear and panel builders. Live with panel builders in India and the UAE.

Engineers working inside LV switchgear and control panels
Live with panel builders in India and the UAE

Scope

Built for the LV panels you quote every week

MDB

Main distribution boards

SMDB

Sub-main distribution boards

FDB / DB

Final distribution boards, incl. RCCB and ELCB rows

MCC

Motor control centres

APFC

Automatic power factor correction

Special

Control panels and special enclosures, configured per customer

Seven steps · real screens

Upload, detect, extract, price, build up, GA, propose

SLD to BOM · upload
SLD to BOM · upload
Actual Intellium Switchgear screens · test data · identifiers removed

Honest gaps, not silent zeros

What the tool actually says when something is missing

AI reads. Rules calculate. Engineers approve. These messages appear on the screens above.

Missing input

"4 of 4 links have no length yet … the links total below is incomplete, not zero."

BOM vs layout

"WARNING · INCOMERS_EXCEED_SECTIONS: 4 incomer lines in the BOM but only 1 incomer section declared."

Convention flagged

"Earth bar: 50% of phase. Estimating convention, needs engineering review."

Catalogue gaps

"Unmatched lines: 27". BOM lines without a price-list match are counted, not dropped.

Regional profiles

One engine, configured for UAE, Saudi Arabia, India and Australia

UAESaudi ArabiaIndiaAustralia
Standards baselineIEC 61439 seriesIEC 61439 as adopted in the GCC (GSO IEC 61439)IS/IEC 61439 series, e.g. IS/IEC 61439-2:2020AS/NZS 61439 series
Regulations and specificationsDEWA Regulations for Electrical Installations (Dubai); DoE Electricity Wiring Regulations (Abu Dhabi)Utility and project specifications, including giga-project practiceConsultant, utility and customer specificationsAS/NZS 3000 Wiring Rules; network and consultant specifications
Conventions capturedApproved DB types in Abu Dhabi; 3- and 4-row DBs in Dubai; local spare-way encodingsSpare-breaker percentages from project specs; rated-but-unwired spares; redlines read separatelyISMC base plinths, SWG sheet gauges, aluminium or copper busbars, INR price listsAustralian switchboard terminology and forms of separation; local OEM catalogues

Standards and regulations are reference baselines for configuration. Standards awareness supports engineering work; it does not replace design verification, testing or certification.

Size the value · illustrative model

Estimate the engineering hours you could release

Change the inputs to match your enquiry mix. The hours with the platform are model assumptions, not measured results; we rebuild this on your own data during a Navigator pilot.

Estimation capacity released

4.1 FTE

about 8,250 hours a year, at about 2,000 hours per FTE

Effort today
1,530 h / month
Effort with the platform
155 h / month
Gross hours released
16,500 h / year
After realisation factor
8,250 h / year

Illustrative only. Released capacity goes into answering more tenders.

Clear boundaries

Three kinds of GA, and which one Intellium produces

Today

Estimation GA

Section row, widths, form and IP, a layout with checks, and area and weight for costing. Labelled as an estimate.

Next

Design and approval GA

Device footprint and enclosure-kit libraries, title block and dimensioning rules, DXF output for consultant submission.

Hand-off

Production GA

Manufacturing drawings stay in panel design tools such as EPLAN Pro Panel, fed by the approved BOM and estimate.

Why Intellium Switchgear

More than a quoting tool: an estimation workflow on a platform

Typical standalone quoting toolIntellium Switchgear on DuneSpan
RulesGeneric extraction logicYour rule pack, regional profile and drawing conventions
PricingPrices looked up or keyed inYour OEM price lists and part numbers
MechanicalDevices onlyBusbar, links, sheet metal and a GA estimate
OrganisationIndividual seatsOrganisation-wide roles, approvals and revisions
Hosting and dataVendor cloudManaged, sovereign cloud or air-gapped; your data is not used to train other clients' models
After the quoteExport and stopFLOW, PROJECTS, HexaGrid OI, Lexora and ERP

General comparison with the typical scope of low-cost standalone quoting tools; individual products vary.